WE Tech will deliver its direct-drive PM shaft generator solution with PM generators from The Switch to a series of two chemical tankers.
- All
- Blogs
- Events
- News
- Newsletters
- People stories
- References
Filter by topic:
- All
- Wind
- Marine
- Wave and Tidal
- Turbo
- CHP
- Energy storage
- Company
Filter by area:
Terntank Rederi, Denmark
These novel product tankers are not only equipped with a low pressure gas dual fuel 2-stroke main engine but also with the direct-drive PM shaft generator solution provided by WE Tech. The direct-drive permanent magnet shaft generator is connected directly to the propeller shaft, so no step-up gearing is required.
ESL Shipping, Finland
WE Tech received an order to deliver The Switch direct-drive permanent magnet shaft generator solution to two new 25,600 dwt dual-fueled handysize bulk carriers, with an option for two more. The vessels are owned by the Finnish ship owner ESL Shipping Ltd., and built at Qingshan Shipyard of Sinotrans & CSC SBICO in China.
Saga LNG Shipping, China
The Switch received a PM shaft generator order with an option of one more from the energy-efficient solution provider WE Tech for an LNG carrier owned by Saga LNG Shipping Pte. Ltd. Deliveries will commence in October 2016.