The Switch has provided ScanWind with third-generation drive train packages that combine a 4.25 MW PMG and FPC for use in offshore wind turbine development efforts.
- All
- Blogs
- Events
- News
- Newsletters
- People stories
- References
Filter by topic:
- All
- Wind
- Marine
- Wave and Tidal
- Turbo
- CHP
- Energy storage
- Company
Filter by area:
As energy needs change, so must the service
Two main issues are dominating the discussions in Asia: China’s feed-in tariff reduction from June 2015 onwards and operational cost reduction and pollution control in marine. Given this scenario, NDRC is trying with all means to push IPPs and wind turbine OEMs to look for fresh opportunities overseas. But how is it possible to make this happen?
Dongfang, China
The Switch has provided Dongfang with a second-generation drive train package that combines a 1.5 MW direct-drive, outer rotor permanent magnet generator with a full-power converter.
PROKON, Germany
Germany-based PROKON placed another order for 100 direct-drive 3 MW PMG and FPC packages in autumn 2013.